Pre-design tool for water transfer networks.
This tool supports preliminary design of water transfer lines from source to destination. Results do not replace engineering calculation with actual elevation profile and pump curves.
What the inputs mean
- Flow rate — the volume to be moved per unit time
- Route length — the real pipe length, not the straight-line distance on a map
- Elevation difference — the lift the pump has to overcome
- SDR and PN — the pipe class, which sets wall thickness and therefore the bore
What the calculation rests on
Friction head loss uses Hazen-Williams with a roughness coefficient C of 145 for polyethylene — the smooth bore of PE is what justifies a value that high. Total head is the elevation difference plus friction loss, and motor power follows from total head and flow rate with a reserve percentage applied.
Why velocity is the constraint
The tool computes velocity for each candidate diameter and flags anything outside roughly 0.5 to 2.5 m/s. Below 0.5 there is a risk of suspended solids settling out. Above 2.5, head loss climbs quickly, pumping energy gets expensive and surge on rapid valve closure becomes a more serious concern. The recommended diameter is the smallest one that keeps velocity inside that band.
What it does not calculate
- The real elevation profile and any high points along the route
- The pump curve and its actual duty point
- Surge and transient pressure
- Local losses at fittings, valves and bends
- Temperature derating above the 20 °C reference
From result to order
The output is an effective internal diameter and a pipe class. To enquire, take the outer diameter and SDR from the catalogue dimensions chart and quote those. If the operating temperature is above 20 °C, apply the derating factor before fixing the SDR.
FAQ
- Which formula is used for HDPE pipe head loss?
- Hazen-Williams with a roughness coefficient C of 145 for polyethylene. For tighter work, or for fluids other than water, Darcy-Weisbach with a computed friction factor is the better basis.
- Why are several diameters offered for one flow rate?
- Because diameter selection is a trade. A larger bore cuts head loss and pumping energy but costs more in pipe. The tool shows every option with its velocity and loss so the trade is visible.
- Is the calculated pump power the motor I should buy?
- No. It is an estimate from total head and flow with a reserve applied. Final motor selection has to come from the pump curve, the real efficiency at the duty point and the starting conditions.
- Does it check for surge?
- No. Surge needs a separate calculation and depends on valve closure speed, line length and flow velocity. On long lines or at higher velocities, check it separately.
Preliminary water transfer line estimate — well depth (20 m) is excluded from total head. Total head equals vertical lift (150 m) plus line friction loss.
- Hazen-Williams C = 145 for PE pipe
- Pump efficiency = 0.75
- Well depth excluded from total head
Results
| OD mm | SDR | PN | e mm | ID mm | v m/s | hf m | H m | kW | Status |
|---|---|---|---|---|---|---|---|---|---|
| 32 | 11 | 16 | 1.45 | 26.18 | 5.16 | 71448251.49 | 71448401.49 | 2985352.38 | High velocity |
| 40 | 11 | 16 | 1.82 | 32.73 | 3.30 | 24095887.77 | 24096037.77 | 1006812.78 | High velocity |
| 50 | 11 | 16 | 2.27 | 40.91 | 2.11 | 8126326.33 | 8126476.33 | 339551.27 | OK |
| 63 | 11 | 16 | 2.86 | 51.55 | 1.33 | 2636266.63 | 2636416.63 | 110158.28 | OK |
| 75 | 11 | 16 | 3.41 | 61.36 | 0.94 | 1127596.54 | 1127746.54 | 47121.01 | OK |
| 90 | 11 | 16 | 4.09 | 73.64 | 0.65 | 463940.07 | 464090.07 | 19391.23 | OK |
| 110 | 11 | 16 | 5.00 | 90.00 | 0.44 | 174563.48 | 174713.48 | 7300.11 | Low velocity |
| 125 | 11 | 16 | 5.68 | 102.27 | 0.34 | 93654.46 | 93804.46 | 3919.46 | Low velocity |
| 140 | 11 | 16 | 6.36 | 114.55 | 0.27 | 53924.67 | 54074.67 | 2259.42 | Low velocity |
| 160 | 11 | 16 | 7.27 | 130.91 | 0.21 | 28139.00 | 28289.00 | 1182.01 | Low velocity |
| 180 | 11 | 16 | 8.18 | 147.27 | 0.16 | 15854.22 | 16004.22 | 668.71 | Low velocity |
| 200 | 11 | 16 | 9.09 | 163.64 | 0.13 | 9489.87 | 9639.87 | 402.79 | Low velocity |
| 225 | 11 | 16 | 10.23 | 184.09 | 0.10 | 5346.83 | 5496.83 | 229.68 | Low velocity |
| 250 | 11 | 16 | 11.36 | 204.55 | 0.08 | 3200.45 | 3350.45 | 139.99 | Low velocity |
| 280 | 11 | 16 | 12.73 | 229.09 | 0.07 | 1842.77 | 1992.77 | 83.26 | Low velocity |
| 315 | 11 | 16 | 14.32 | 257.73 | 0.05 | 1038.26 | 1188.26 | 49.65 | Low velocity |
| 355 | 11 | 16 | 16.14 | 290.45 | 0.04 | 579.98 | 729.98 | 30.50 | Low velocity |
| 400 | 11 | 16 | 18.18 | 327.27 | 0.03 | 324.30 | 474.30 | 19.82 | Low velocity |
| 450 | 11 | 16 | 20.45 | 368.18 | 0.03 | 182.72 | 332.72 | 13.90 | Low velocity |
| 500 | 11 | 16 | 22.73 | 409.09 | 0.02 | 109.37 | 259.37 | 10.84 | Low velocity |
| 560 | 11 | 16 | 25.45 | 458.18 | 0.02 | 62.97 | 212.97 | 8.90 | Low velocity |
| 630 | 11 | 16 | 28.64 | 515.45 | 0.01 | 35.48 | 185.48 | 7.75 | Low velocity |